Paritian

Engineering

Downtime Cost Calculator

The cost of a stoppage, counting lost margin and the fixed costs that keep running.

Results

Total cost 4104.00
Quantity 720
Total cost 684.00

What this tool does

A stopped line costs twice: the margin on the units not made, and the wages, rent and energy that continue regardless. Putting both into one hourly figure is usually what justifies a spare part on the shelf.

Formula

cost = hours stops × (lost margin per hour + fixed cost per hour)

Variables

SymbolMeaningUnit
hHours
uThroughput
mMargin
fCost
CTotal cost
LUQuantity
CHTotal cost

Worked example

  • Hours6
  • Throughput120
  • Margin4.2
  • Cost180
  • Total cost4104.00
  • Quantity720
  • Total cost684.00

Limitations

  • The result is an estimate based only on the values you type. Real situations often include factors this calculator does not know about.
  • The tool works with whatever currency you use for the inputs; it does not convert between currencies.