Paritian

Engineering

First Pass Yield Calculator

Share of units that pass without rework, alongside the final yield.

Results

Quality 92.500 %
Quality 98.500 %
Percentage 1.500 %

What this tool does

Final yield counts anything that eventually ships; first pass yield counts only what was right the first time. The gap between the two is the hidden factory — the rework nobody plans for but everyone pays for.

Formula

FPY = good units à first ÷ units inputs × 100

Variables

SymbolMeaningUnit
inpTotal units produced
rwQuantity
scQuantity
FPYQuality%
TYQuality%
SRPercentage%

Worked example

  • Total units produced1000
  • Quantity60
  • Quantity15
  • Quality92.500 %
  • Quality98.500 %
  • Percentage1.500 %

Limitations

  • The result is an estimate based only on the values you type. Real situations often include factors this calculator does not know about.
  • For work that must comply with a standard or be signed off, check the result against the applicable code and have it reviewed by a qualified engineer.